Enter your sizes
Assumptions (change if your office uses different constants)
Result
Nominal mixes as traditionally used; IS 456:2000 allows nominal mix concrete only up to M20.
How it’s calculated
Questions
How many cement bags are needed for 1 m³ of M20 concrete?
For a nominal 1:1.5:3 mix, about 8 bags (≈ 400 kg) of cement per m³, with about 0.42 m³ of sand and 0.84 m³ of aggregate.
Why multiply by 1.54?
Dry materials shrink when mixed with water as the voids fill up, so about 54% more dry volume is needed for 1 m³ of wet concrete. Some offices use 1.52 or 1.57, change it under Assumptions.
What is the M20 concrete ratio of cement, sand and aggregate?
Nominal M20 is 1 : 1.5 : 3 (cement : sand : aggregate) by volume, about 8 bags of cement, 0.42 m³ sand and 0.84 m³ of 20 mm aggregate per m³ of concrete.
Can I use this for M25 or M30?
No: M25 and above should be produced to a design mix (IS 10262) with proportions by weight from a lab. This calculator is for nominal mixes up to M20, which IS 456 allows.
Need the full estimate, not just one item?
BESTimate makes the whole government-format estimate: Measurement, Abstract and Summary in Excel, with BMC, PWD, CPWD, MJP and CIDCO rates built in. Launching 26 November 2026 · first 99 to pre-register get 50% off for 6 months.